学科分类
/ 1
3 个结果
  • 简介:[1]ChinaCommunicationsSecondHighwaySurveyDesignandResearchInstitute(CCSHSDRI),1996.HighwayDesignHandbook:Subgrade(2ndedn.).Beijing:ChinaCommunicationsPress.(inChinese)[2]GengTading,ChenChuankang,YangWuyangetal.,1978.OnthehighwaynaturalregionalizationofChina.ActaGeographicaSinica,33(1):49-62.(inChinese)[3]HighwayPlanningandDesignInstituteoftheMinistryofCommunications,1986.StandardofClimaticZoningforHighway(JTJ003-86).Beijing:ChinaCommunicationsPress.(inChinese)[4]JillOvik,BjornBirgisson,DavidENewcomb,1999.CharacterizingSeasonalVariationsinFlexiblePavementMaterialProperties.TransportationResearchRecord,1684:1-7.[5]KennedyTKetal.,1994.SuperiorPerformingAsphaltPavement(Superpave):TheProductoftheSHRPAsphaltResearchProgram.SHRP,NationalResearchCouncil,WashingtonD.C.[6]LiBin,1957.Someproblemsaboutregionalizingclimaticzoningforhighway.EngineeringConstruction,5:19-23.(inChinese)[7]LiBin,1959.Explanationsaboutrevisionofnationalclimaticzoningforhighway.Highway,15(SpecialIssue):33-36.(inChinese)[8]LiBin,1980.Chinahighwaynaturalregionalizationofpermafrost.AutomobileandHighway,1:39-55.(inChinese)[9]LiGuishun,1996.TertiaryhighwaynaturalregionalizationofShanxiprovince.ScienceandTechnologyofShanxiCommunication,5:13-18.(inChinese)[10]MaureenAKestler,GordonLHanek,MarkATruebe,2001.Evaluatingmoisturesensorsandmonitoringseasonalmoisturevariationinlow-volumeroads.TransportationResearchRecord,1755:97-107.[11]MohseniA,1996.LTTPSeasonalACPavementTemperatureModels.FHWA,U.S.DepartmentofTransportation,WashingtonD.C.[12]PeterJBosscher,HussainUBahia,SuwithoThomasetal.,1997.Relationshipbetweenpavementtemperatureandweatherdata:Wisconsinfieldstudytoverifysuperpavealgorithm.TransportationResearchRecord,1609:1-11.[13]RabinowSD,RadaGR,TayabjiSDetal.,1993.De

  • 标签: 中国公路 公路自然区划 回顾展望
  • 简介:10月16日,柴河林业局柴双公路61—68公里处地质灾害项目迎来终验。由省厅环境处徐建超、省地质环境监测总站董宏志等组成的验收组,对项目进行验收。在外业验收现场,专家对照图纸测量了拦石墙的长、宽、高以及排水沟深度,询问了主动网、被动网规格、型号、尺寸以及施工过程、施工方式和施工细节,对有关问题进行了探讨。

  • 标签: 公路地质灾害 环境监测总站 施工过程 柴河林业局 施工方式 排水沟
  • 简介:以福建省公路交通情况为基本资料,通过运用ArcGIS的网络分析功能,从时间距离的角度,采用加权平均旅行时间的指标,对福建省公路交通网络体系的可达性情况进行计算、分析,得出福建省公路交通网络体系可达性的区域等级情况,在此基础上分别对第一、二、三阶梯的可达性成因进行分析,并对福建省不同地区的交通可达性进行了比较.

  • 标签: 可达性 网络分析 福建省公路 节点 时间矩阵